Skip to content
Online Payment Digital Catalogue
Online Payment Service Request
Repair and Maintenance

Servo Motor Maintenance

Planned maintenance keeps the mechanical and electrical condition of the motor under control before a fault occurs. Cleaning, insulation, mechanical tolerances, brake, cooling and connections are assessed in the laboratory; the work carried out is determined by the design of the device.

Servo motor housing opened during a controlled inspection. Real laboratory / field photo
01

Maintenance overview

Planned maintenance keeps the mechanical and electrical condition of the motor under control before a fault occurs. Cleaning, insulation, mechanical tolerances, brake, cooling and connections are assessed in the laboratory; the work carried out is determined by the design of the device.

No fixed maintenance interval is given for every motor; the interval is agreed together with you based on the operating environment and load.

02

When is an assessment needed?

  • Harsh operating environmentDust, humidity, oil or high temperature.
  • No maintenance historyIt is unknown when the last maintenance was carried out.
  • Change in temperature or vibrationBehaviour has changed, even without an alarm.
  • Heavy shift loadA continuously running line with a planned downtime window.

A symptom is not a diagnosis; the cause becomes clear during laboratory diagnosis.

03

Maintenance scope

The work performed depends on the device design and the diagnosis.
AreaDescription
Cleaning and visual inspectionExternal and internal surfaces, connectors and cable entries.
Insulation and electrical measurementWinding condition and connection resistances.
Mechanical tolerancesCheck of bearings, shaft and brake mechanics.
Cooling and connectionsFan, cooling surfaces, connectors and grounding.
04

Maintenance result and delivery

At the end of maintenance, the motor is run under suitable conditions and the findings are shared in a short summary. No parts are replaced without approval; if maintenance reveals a finding that requires repair, it is reported separately.

Repair or maintenance? If there is an existing fault, the repair process is needed instead of maintenance: Servo Motor Repair.
05

Quotation, approval and delivery process

  1. Registration

    We record the device details and symptoms and send you a reference number.

  2. Analysis

    The fault is diagnosed in the laboratory, so it is clear what has failed.

  3. Quotation and approval

    Scope and price are confirmed in writing; nothing is done without your approval.

  4. Repair

    The repair is carried out within the approved scope; you are informed of any deviation.

  5. Testing and delivery

    The device is tested under suitable conditions and returned with a short technical summary.

06

Preparing for shipment

For batch maintenance, stating the number of devices and the planned downtime period in the request form makes planning easier. A schedule is not mandatory; a free-form planning note is enough.

07

Frequently asked

08

Related services and work

View the related album
CallRequest Maintenance
WhatsAppSend photos and device details Phone+90 545 729 49 11